Skip to content

+852 23960161

llewellynlai@gmail.com

Comming Transportation Engineering Co., Limited

Expertise on Heavy Transportation Engineering

Menu
  • Chiller
  • Generator-Set
  • Heavy Medical Equipment
  • Other industrial ovesized items
  • Heat Exchangers, Sand Filters, AHUs, MCC, Pumps, Fans, PAUs and Cooling Towers
  • Oversized Valuable Items
  • Food industry equipment
  • Latest Job References
  • Contact Us

重型機械搬運及吊運服務 | 金明搬運工程

Comming金明搬運工程有限公司COMMING TRANSPORTATION ENGINEERINGCOMMING TRANSPORTATION ENGINEERING金明搬運工程有限公司
服務Services案例Projects關於與安全About & Safety聯絡Contact工程查詢Enquire
Comming Transportation Engineering

服務與工程能力Services & Capabilities

按設備、路線與現場條件,協調由運輸、吊運至最終就位的工作範圍。Transport, hoisting and final positioning planned around the equipment, route and site.

綜合工程能力Integrated Capabilities

由設備資料,
規劃至最終就位。
From equipment data to final positioning.

金明以四項核心工程服務回應不同設備與場地條件;實際工作範圍按重量、尺寸、通道、吊點及施工次序確認。Four core services support different equipment and site conditions. The final scope is defined by weight, dimensions, access, lifting points and work sequence.

重型機械搬運
MACHINERY MOVING

重型機械搬運Heavy Machinery Moving

按重量、尺寸、通道及最終位置,規劃設備裝卸、場內轉運、保護與就位。Loading, internal transfer, protection and positioning planned around weight, dimensions, access and final location.

瀏覽相關工程Explore related work →
設備吊運及精密定位
LIFTING & POSITIONING

設備吊運及精密定位Lifting & Precision Positioning

協調起吊位置、工作次序、設備保護及最終定位,配合現場工序與空間限制。Lifting points, work sequence, protection and final positioning coordinated around site constraints.

瀏覽相關工程Explore related work →
機械及設施搬遷
FACILITY RELOCATION

機械及設施搬遷Machinery & Facility Relocation

支援廠房、醫院、機電及特殊設備搬遷,涵蓋拆箱、搬運、轉運與重新就位。Relocation support for factories, hospitals, MEP and specialist equipment, from unpacking and transfer to repositioning.

瀏覽相關工程Explore related work →
工程運輸與現場協調
PROJECT TRANSPORTATION

工程運輸與現場協調Project Transportation & Site Coordination

按設備、路線及施工時段安排工程運輸,銜接上落貨、吊運及現場交接。Project transportation planned around equipment, route and working windows, linked with lifting and site handover.

瀏覽相關工程Explore related work →
工程方法Project Method

工程方法先於設備進場。The method comes before mobilisation.

先確認設備與現場資料,再協調路線、起吊、保護、轉運及定位次序,讓各工作環節銜接清晰。Equipment and site information guide route, lifting, protection, transfer and positioning sequences.

金明搬運工程有限公司COMMING TRANSPORTATION ENGINEERING CO. LIMITEDCOMMING TRANSPORTATION ENGINEERING CO. LIMITED
Google 地圖:金明搬運工程有限公司Google Maps: Comming Transportation EngineeringTel: (852) 2396 0161 · Fax: (852) 2789 1027Facebook ↗
工程查詢Project enquiry · 2396 0161

Archives

Meta

  • Log in
  • Chiller
  • Generator-Set
  • Heavy Medical Equipment
  • Other industrial ovesized items
  • Heat Exchangers, Sand Filters, AHUs, MCC, Pumps, Fans, PAUs and Cooling Towers
  • Oversized Valuable Items
  • Food industry equipment
  • Latest Job References
  • Contact Us

Comming Transportation Eng. Co., Ltd 2017 | All Rights Reserved. Corporate Lite theme by Flythemes